How Your Order
Is Actually Made
Eight controlled stages from consultation to courier, each with a defined owner and a documented checkpoint. No black boxes, no surprises.
How We Work
Manufacturing Process
Eight controlled stages, each with a defined owner and a documented checkpoint.
Consultation
Share your artwork, specification and quantities. We reply with a detailed quotation within 24 hours.
Design
Our designers produce free digital mockups and revise until you approve every detail.
Sampling
A physical pre-production sample is made, photographed and couriered for your sign-off.
Approval
You confirm fabric, colour, sizing and branding. The approved sample becomes the standard.
Production
Cutting, sublimation, stitching and finishing run in-house with milestone photo updates.
Quality Inspection
Three-stage inspection: incoming materials, in-line audit and final piece-by-piece check.
Packaging
Individual poly-bagging, retail-ready labelling and size-run export cartons.
Shipping
Courier booked, documentation prepared, tracking shared the same day it leaves.
Quality Control
Three Inspections Before Anything Leaves Sialkot
Quality is not a final step here — it is checked at three separate points, by three separate people, against the sample you approved.
- Stage 01 · Incoming — every fabric roll, latex sheet and trim delivery checked for GSM, shade, shrinkage and defects before release to the floor.
- Stage 02 · In-Line — supervisors audit stitch density, seam alignment, print registration and measurement tolerance during the run.
- Stage 03 · Final — finished goods checked piece by piece against the approved sample before packing.
- Third-party inspection (SGS, Intertek, Bureau Veritas) welcome at any stage.
Capability
In-House Disciplines
Most suppliers specialise in one process and sub-contract the rest — which is where quality and deadlines quietly fall apart.
Digital Sublimation
Calibrated wide-format printers with profiled inks for repeatable Pantone-referenced colour.
Precision Cutting
CAD pattern grading and layered cutting for consistent sizing across full runs.
Technical Stitching
Flatlock, overlock, coverstitch and bar-tack reinforcement on stress points.
Computerised Embroidery
Multi-head machines for logos, crests, 3D puff and appliqué work.
PVC & Rubber Moulding
In-house tooling for 2D and 3D patches and injection-moulded hardware.
Glove Assembly
Hand-finished goalkeeper gloves using imported German latex palms.
Timeline
A Typical 50-Piece Order
What happens, and when, from enquiry to courier collection.
Day 0–1
Enquiry & Quotation
Line-item quotation with fabric options and volume pricing tiers.
Day 1–3
Design & Mockup Approval
Unlimited free revisions until you approve every detail.
Day 4–10
Pre-Production Sample
Physical sample made, photographed and couriered. Optional for repeat clients.
Day 11–13
Printing & Cutting
Panels sublimated, colour-verified and cut to graded CAD patterns.
Day 14–20
Stitching & Branding
Assembly, embroidery, patch application, labelling and finishing.
Day 21–28
QC, Packing & Delivery
Final inspection, export cartoning and door-to-door courier with tracking.
Start Your Programme
See The Line Your Order Will Run On
Book an in-person factory tour in Sialkot, or a live video walkthrough with your account manager.